Westpark 3 & 4

OVERVIEW

Westpark Phase 3 is a 783 unit project located in the City of Roseville. Westpark acquired this property in December 2009 from Pulte Homes and repositioned this property with a redesign and amended infrastructure phasing plan, increasing the overall unit count and improving the cash flow requirements for the development of the property. The revised entitlements and agreements were approved in December 2010 and improvement plans prepared for the backbone infrastructure. Villages 13 and 15 were sold in April 2012 to Meritage Homes and KB Homes. The HDR property was sold to Alan Ives Construction, LLC in 2017.

Westpark Phase 4 is a 1,057 unit project, including 887 single-family lots and 170 multi-family units, located in the City of Roseville. Westpark acquired this property in December 2009 from Pulte Homes and repositioned the property with a redesigned site plan and re-engineered infrastructure phasing plan to reduce front-end expenses. The revised entitlements were approved in July 2013. The 1,057 units were sold to Pulte Homes and Lennar Homes in September 2013. In 2017, 11.4 acres of industrial land was sold to Westpark Storage and in 2019, another 21.1 acres was sold to the City of Roseville. The northernmost parcel of light industrial was deeded to the City of Roseville in 2020 in exchange for Fiddyment Parcel F-55. Parcel F-55 was mapped to include 99 LDR lots. This deeded acreage was combined with the City’s existing acreage and is now the Roseville Soccer Complex a much needed regional amenity.

Westpark 3 APPROVED LAND USES:

  • Low Density Residential, 533 units
  • High Density Residential, 250 units
  • Park, 4.3 acres

Westpark 4 APPROVED LAND USES:

  • Low Density Residential, 887 units
  • High Density Residential, 172 units
  • Industrial/Light Industrial, 88.1 acres
  • Elementary School, 8.5 acres
  • Parks, 14.0 acres
  • Open Space, 345.7 acres
Land Use Map
Video